BRIDGE OVER ROKLANSKÝ CREEK IN MODRAVA, Czech Republic

Customer
Správa Národního parku a chráněné krajinné oblasti Šumava
Architect
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
preparation for the 2011–2012 period
Project realisation
March 2009 – July 2011
Activities undertaken
planning permit documentation, building permit documentation, tender documentation
Construction expenses
about CZK 6 mil.

The objective of this project is the construction of a bridge over Roklanský Creek in Šumava National Park. The projects includes the construction of a bridge over a mill leet and the unstabilised base road connected with the Modrava – Javoří Saw Mill road on one side and the running track along Roklanský Creek on the other side. This construction will be connected to the communal road network in Modrava. The main construction is the single-storey, one-way, single-span road bridge. The bridges foundations consists of the deep micro pilots, the abutments are the massive reinforced concrete structures lined with undressed stone. The load-bearing construction system consists of two peripheral parapet laminated timber beams connected by steel cross beams with the crosswind bracing. The bridge roadway consists of timber scants supporting the oak planks. The main beams also serve as the railings. The timber railing is on the each end of the bridge attached to the reinforced concrete abutment wing walls lined with undressed stone. The main load-bearing beams are to be set on the bridge bearings by the mobile crane, cross beams will be put into the position above the creek.

Hide
Informace Další Předchozí Zavřít