HIGHWAY D3,Czech Republic

Customer
Ředitelství silnic a dálnic ČR
Architect
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
March 2003 – November 2010
Project realisation
November 2002 – December 2006
Activities undertaken
Building permit documentation, Construction specification documentation
Construction expenses
CZK 680 million

The subject matter of the work is reconstruction of the existing two-lane road including the Čekanice bridge that was built in 1992 as the right half of the highway-to-be and existing four-lane in the level 74,080 – 79,144 km. Regarding the fact that the parameters of the current disposition do not conform to the highway standard, it is necessary to replace the complete structure of the pavement, modify the transverse arrangement and alignment and ensure appropriate drainage. In addition, reconstruction of access roads to the rainwater sedimentation basins, cable ducts for SOS alarm systems, landscaping and soil reclamation will be carried out as a part of the construction.

Hide
Informace Další Předchozí Zavřít