MODERNISATION HIGHWAY D1, SECTION 25 AND 13

Customer
Ředitelství silnic a dálnic
Designer
OBERMEYER HELIKA a.s.
Construction Period
Section 25: 2015 - 2016, section 13: 2017 - 2018
Project realisation
2012-2016
Activities undertaken
Building permit documentation, construction documentation, author supervision
Construction expenses
Section 25: 494 mill CZK, section13: 1043 mill CZK

The project solves the modernization of the D1 km 98 Slavníč EXIT 104 Větrný Jeníkov 6.8 km length and the EXIT 178 Ostrovačice Kývalka section 2 km on the D28/120 category. The modernization includes complete reconstruction of 4 bridge structures (demolition and new bridges), repairs of one bridge and displacement of a noise barrier wall in the length of 120m (section 25) and complete reconstruction of 5 bridge structures (demolition and new bridges), repairs of one bridge and design of two new noise barriers in lengths 1000 and 650m (section 13). As part of the modernization, the highway body was expanded, a new surface was made, a new drainage was made, and utilities were constructed. The complexity of the whole project results from the necessity of modernization while maintaining traffic in one direction of the motorway.

Hide
Informace Další Předchozí Zavřít