Construction Period
March 2010 – September 2010, April 2011 – October
Project realisation
August 2008 – 2010
Activities undertaken
Technical study, Construction notification document, Construction tender dossier, Implementation documents, Coordination, Author and technical supervision
Construction expenses
about CZK 1.1 billion

The subject of the work is reconstruction of the oldest stretch of the Prague ring road between two-level crossroads MUK Slivenec and MUK Třebonice. Full road pavement will be replaced in the course of 7.2 km long reconstruction. Cement-concrete cover will be used on the vast majority instead of original asphalt cover. At the same time, maximum adaptation of the proposed components to the latest standards take place (modification of lateral slopes, modification of lengths and widths of merging lanes and turning lanes of two-level crossroads, replacement and completion of crash barriers. The construction also includes repair of branches of adjacent two-level crossroads, repair of sewer systems, completion of lighting system on the ring road, installation of line traffic signs and information portals, and completion of the SOKP information system - interconnection of SSUD Mirošovice and SSUD Rudná centres.

Hide
Informace Další Předchozí Zavřít