RICHTER + FRENZEL STORAGE AND LOGISTICS COMPLEX, PRAGUE

Customer
Richter + Frenzel, s. r. o.
Architect
OBERMEYER HELIKA a.s.
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
2006 – 2007
Project realisation
2004 – 2006
Activities undertaken
site survey, assessment, measurements, urban study, urban and architectural study, construction design, project management, author supervision
Construction expenses
CZK

CONSTRUCTION DATA
built-up volume: 89 600 m3
built-up area: 8 690 m2

The compact building was created with associated warehouse operations and architectural design legibly express functional content of individual parts of the building. The proposed facility consists of warehouse and its facilities, with operations receiving and shipping, the administrative area, shop and showroom. Architectural landmark is a rounded corner on the showroom, other areas have, in accordance with the functions they perform a utilitarian character. The building is designed as a reinforced concrete frame with colored sheath enclosing panels. In the administrative section and canteen object to apply a large window openings, which contribute to creating favorable working conditions for employees of the complex. The project addresses the modification of the parterre, unpaved areas are grassed and landscaped modifications. The layout object responds to the immediate proximity to the ring road administrative tract is located along the access road quiet and protected against noise from traffic on a street circuit.

Hide
Informace Další Předchozí Zavřít