SEMILY REGIONAL HOSPITAL – RECONSTRUCTION OF SURGICAL PAVILION – MAIN BUILDING STAGE 2

Customer
Oblastní nemocnice v Semilech
Architect
OBERMEYER HELIKA a.s.
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
1994 – 1995
Project realisation
1993 – 1994
Activities undertaken
study for the development of the complex and operation theatres building, project documentation for the urban planning and building permit submissions, construction documentation, author supervision by the Head Designer, preparation of construction works documentation and working drawings, site inspections and coordination activities by project designer
Construction expenses
CZK 90 million / 3,3 mill. EUR

TECHNICAL DETAILS
built-up volume: 16 000 m3
built- up area: 800 m2

TYPICAL UNITS
number of beds: 60 beds, 6 beds in post-operation care ward
number of examination rooms: 2 examination rooms, 2 X-ray examination rooms

New pavilion of surgical sciences was developed after a total renovation of the surgical pavilion (2.stage reconstruction) in conjunction with adjacent operating theaters and a new communication vertical pavilion (1.stage new building). In the basement there is a workplace sterilization. At the main entrance on the ground floor and continues outpatient diagnostic part. At 2 and 3 NP formed separate standard bed units.

The main south-east facade with architectural features and plaster mouldings, including floor and window ledges, pilasters, window framing and bossage, was restored and the later addition unified with the rest of the building. The use of red and grey colour scheme was the direct result of combining ashlar facing of the addition with the rich vegetation in surrounding area .