SEMILY REGIONAL HOSPITAL – SURGICAL PAVILION WITH OPERATING THEATRES – EXTENSION STAGE 1

Customer
Oblastní nemocnice v Semilech
Architect
OBERMEYER HELIKA a.s.
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
1992 – 1993
Project realisation
1991 – 1992
Activities undertaken
study for the development of the complex and operation theatres building, project documentation for the urban planning and building permit submissions, construction documentation, author supervision by the Head Designer, preparation of construction works documentation and working drawings, site inspections and coordination activities by project designer
Construction expenses
90 mill. CZK / 3,33 mill. EUR

TECHNICAL DETAILS
built-up volume: 11,500 m3
built- up area: 550 m2
TYPICAL UNITS: 1 super aseptic operating theatre, 1 aseptic operating theatre, 1 septic operating theatre

The construction of the pavilion with operating theatres was the first stage of the project to revitalise the hospital complex. The building is attached to the surgical sciences pavilion creating is new wing with the high-capacity vertical transport shaft and the new main unrestricted entrance. The arched front facade of the building facing the river was inspired by the shape of river meander. Incorporation of the building in the surroundings was assisted by retaining mature trees on the site while the external envelope from face red bricks divided by the white strips of ceiling rings further underlines the building's harmonious incorporation in the natural environment. Ashlar facing is used for the walls inside the entrance hall and the halls on upper floors. The building houses three operating theatres. The theatres, which are lit by large composite windows, have poured solid floors and were painted using paints with bactericidal additives. In the main entrance there is an access for ambulances while a separate entrance is provided for the servicing staff.