SWIMMING-POOL LAGOON, PRAGUE 9

Customer
Chapman Taylor Partners, Londýn
Architect
Michael Pretty Architects
Main building designer
OBERMEYER HELIKA a.s.
Construction Period
1999 - 2000
Project realisation
1998 - 2000
Activities undertaken
pre-design and design documentation, author supervision
Construction expenses
130 mill. CZK / 4,8 mill. EUR

TECHNICAL DATA:
built-up volume: 18 000 m3
built-up area: 1 656 m2
TYPICAL UNITS:
25-metre-long swimming pool for 162
total capacity is up to 380 visitors
parking area for 75 passenger cars and 2 buses

The swimming hall with the complementary program includes : main swimming pool 25 x 13 m (6 lanes) with bottom massage grids, wall massage nozzles and water jets. There is also located a pool for children with the water attractions: spiral water chute, rapids, funny pool with fountains and with the streaming water, paddling pool and whirlpool and massage bath.

There is a fitness centre (a conditioning gym and an aerobic room, physio- and therapeutic centre, sauna for 8 persons, steam chamber for 6 – 7 persons, salt bath and 2 sun parlors. Wet and dry coffee lounge and outdoor sun terrace are available for visitors. The building is also equiped with the indispensable facility for the visitors, employees and technology. The transportation between storeys is ensured by the lift for 8 persons, enabling the transportation of the disabled people as well. The interior of the building is designed from the materials, which are resistant against the moisture and chlorine effect, from materials, which are easy to clean and durable.

Hide
Informace Další Předchozí Zavřít