study for of Náchod Regional hospital development by 2020
planning permit documentation 2009
synergies in the negotiation of planning permit documentation
building permit documentation 1st stage
building permit
tender documentation
study 2nd stage of refurbisment
construction documentation
author supervision
as-built documentation
1,615 mill. CZK / 60 mill. EUR costs
195.000 m³ built-up volume
9.000 m² built-up area
The main aim of the project is to complete the construction of the complex of the Náchod Regional Hospital. The urban and architectural design is based on requirement to coordinate, integrate and modernise the basic functions of the hospital which is currently dividend into two functional sections (the upper and the lower hospital centre). The completion of the lower komplex and subsequent vacation of the upper centre will reset in amalgamating the currently fragmented hospital wals and examination facilities thereby providing better access to medical care for the patients.
The proposed building komplex is dividend into three basic sections – the entrance section with the admission, outpatient and emergency admissions unit, the section with examination and treatment facilities and the wards. The basic feature of the proposed design concept for the komplex is to create preconditions for smoothly functioning operating relationships, that is for the collision-free movement of persons and materials. The design proposes creating a central corridor consisting of a system of passageways on several levels running through the entire komplex from the lowest section, which is the entrance section with the admission unit (out-patient units with emergency) to the existing pavilion (pathology unit with laboratories) situated at the highest level.