WALTROVKA MECHANICA

New office building
Customer
Penta Investments, s.r.o.
Area
Prague 5 - Jinonice
Architect
Atelier Krátký
Head designer
OBERMEYER HELIKA a.s.
Project period
2014 – 2018
Construction Period
2017 – 2018
Services provided

planning permit documentation
building permit documentation
construction documentation
author supervision

Numbers

13.150 m² land area
4.300 m² built-up area
177.300 m³ built-up volume
30.000 m² gross floor area
26.300 m² office area

BIM
Project description

1st place Best of Realty 2017

The new buildings Mechanica 1 and 2 have 7 floors, the last of which is receding. The actual design of the facade is based on the industrial past of the area, the facade racking into large formats evokes the factory halls. Opening windows with aluminum frames and insulating double glazing are placed directly into the reinforced concrete structure. There are fitted masses of machine rooms with aluminum lamellas on the roof.
The layout of buildings is characterized by a high degree of flexibility in order to satisfy the widest range of future tenants' requirements for floor layouts. Two vertical communication cores with integrated toilets and installation shafts serve the building. On the ground floor there is always one central entrance hall directly connected to the lifts.

Contact us

OBERMEYER HELIKA a.s.

© 2024 OBERMEYER Helika | Developed by
Privacy Policy
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram