PARKING HOUSE P + R, CERNY MOST

New building
Customer
Hlavní Město Praha - Odbor investiční
Area
Prague 14 - Černý most
Head designer
OBERMEYER HELIKA a.s.
Project period
2011 – 2021
Construction Period
2020 – 2021
Services provided

traffic solution study
pre-design activity
technical and consulting activities involved in completing the grant application planning permit documentation
building permit documentation
tender documentation
author's supervision

Numbers

7 460 m² built-up area
cca 530 mil. CZK without tax/ cca 21,6 mil. € excl. VAT costs

3D
Project description

The public benefit construction of a P + R type parking garage provides up to 880 parking spaces and is built on the site of the former aboveground car park in Chlumecká Street.

The building is based on a reinforced concrete monolithic skeleton, into which insulated installations with technical equipment are inserted. The facade is partially covered with greenery to improve the environment and enhance the surroundings of the main road. The four-storey building is divided longitudinally by a central ventilation and translucent shaft, where the individual half-floors are shifted in height (8 half-floors).

The publicly beneficial building of the P + R (park and ride) car park is built on the site of the existing ground car park and increases the parking capacity to 880 parking spaces. It is included in the city system of P + R.

Contact us

OBERMEYER HELIKA a.s.

© 2024 OBERMEYER Helika | Developed by
Privacy Policy
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram