WELDING HALL SKODA AUTO, KVASINY

Extension East
Customer
Škoda Auto, a.s.
Area
Kvasiny
Head designer
OBERMEYER HELIKA a.s.
Project period
2012 – 2020
Construction Period
2013 – 2020
Services provided

planning permit documentation
building permit documentation
tender documentation
construction documentation
documentation for building alteration
author supervision

Numbers

2,3 mld CZK = cca cca 92 mil. € excl. VAT costs
49 450 m² built-up area
892 400 m³ built-up volume
823 m pathways
26 186 m² infrastructure and parking lots

Project description

Production halls (welding hall) and a logistics hall with a planned capacity of 650 and 220 car bodies per day in three shifts. Furthermore, the change of the 3rd floor to training facilities. The layout of the building is based mainly on the spatial requirements of technology and logistics. The surface treatment of the building and the division of areas follow the standard of the achieved degree of corporate image. The project solution includes all infrastructure.
The project also includes all infrastructure.